Orbit Bench needed a portable workstation for field technicians. The key requirements were quick deployment and secure storage.
Iteration cycle
We built two prototypes in three weeks. Version two replaced the folding braces with a welded crossbar, improving stability.
Production considerations
We sourced phenolic tops from a regional supplier to reduce lead time. The change saved two weeks in the production schedule.
What we learned
Early supplier outreach keeps prototype timelines realistic.